Project

Heuristische Produktionsfeinplanung

Project

Oct 2006 - Mar 2009
2008
A. Beham, S. M. Winkler, S. Wagner, M. Affenzeller - A Genetic Programming Approach to Solve Scheduling Problems with Parallel Simulation - Proceedings of the 22nd IEEE International Parallel & Distributed Processing Symposium, Miami, United States of America, 2008, pp. 5 more
2008
A. Beham, M. Affenzeller, S. Wagner, G. K. Kronberger - Simulation Optimization with HeuristicLab - Proceedings of the 20th European Modeling and Simulation Symposium, Campora San Giovanni, Italy, 2008, pp. 75-80 more