Forschungsgebiet
Produktionsoptimierung
Personen:
- DI (FH) Klaus Altendorfer PhD
- Prof. (FH) Mag. Dr. Joachim Paul Althaler
- Manuel Brunner B.Sc.
- DI Martin Dickbauer
- Univ.Prof.Dr.mont Corinna Engelhardt-Nowitzki
- Thomas Felberbauer BSc MSc
- Daniel Gruber BSc MSc
- DI (FH) Alexander Hübl
- Prof. (FH) Dipl.-Ing. Dr. Herbert Jodlbauer
- Prof. (FH) Dipl.-Ing. Dr. Johann Kastner
- FH-Prof. Mag. Dr. Berthold Kerschbaumer
- DI (FH) Christian Kneidinger BSc MSc
- Dipl. Ing. Dr. Gabriel Kronberger
- Valeska Alexandra Sofia Nassiri BSc
- Andreas Nußdorfer BSc
- Dipl.-Ing. (FH) Franz Obermair
- Prof. (FH) Dipl.-Ing. Christian Weger
- Prof. (FH) Dipl.-Ing. Dr. Gernot Zitzenbacher
Publications:
| 2011 | Design and set up of a virtual reality system F. Obermair, C. Weger, A. Nußdorfer BSc, V. Nassiri, M. Brunner BSc, F. Freudhofer, J. Reitzenberger, R. Wiesinger, R. Guse - Dimensionierung und Aufbau einer Virtual Reality Anlage in Forschungsinitiative AGTIL 2011 (Editors: C. Engelhardt-Nowitzki, R. Kohlberger, R. Traxler) - Shaker Verlag, 2011, pp. 15-27 |
| 2011 | Cost and Profit Distribution in Value Chains K. Altendorfer, S. Reitner, H. Jodlbauer, G. Atzlinger - Cost and Profit Distribution in Value Chains - Proceedings - 1st International Conference on Value Chain Management Steyr 2011, Steyr, Österreich, 2011, pp. 339-360 |
| 2011 | Capacity and Inventory Planning for Make-to-Order Production Systems - The Impact of a Customer Required Lead Time Distribution K. Altendorfer - Capacity and Inventory Planning for Make-to-Order Production Systems - The Impact of a Customer Required Lead Time Distribution - Phd Thesis, Universität Wien, Österreich, 2011, pp. 1-168 |
| 2011 | Flexible model for analyzing production systems with discrete event simulation A. Hübl, K. Altendorfer, H. Jodlbauer, M. Gansterer, R. Hartl - Flexible model for analyzing production systems with discrete event simulation - Proceedings of 2011 Winter Simulation Conference, Phoenix, Vereinigte Staaten von Amerika, 2011, pp. 1559-1570 |
| 2011 | Two Measures of Production System Flexibility and their Application to Identify Optimal Capacity Investment K. Altendorfer, C. Engelhardt-Nowitzki, H. Jodlbauer - Two Measures of Production System Flexibility and their Application to Identify Optimal Capacity Investment - Proceedings - 1st International Conference on Value Chain Management Steyr 2011, Steyr, Österreich, 2011, pp. 441-461 |
| 2011 | Was macht eine gute Planung aus H. Jodlbauer, S. Reitner - Was macht eine gute Planung aus - Productivity Management, Vol. 2011, No. 4, 2011, pp. 23-25 |
| 2011 | Effects of WIPCAP and work-ahead-window on the logistic operating curves A. Hübl, K. Altendorfer, H. Jodlbauer - Einfluss von Vorgriffshorizont und WIP Grenze auf logistische Kennlinien in einem Conwip System - Tagungsband FFH 2011 (5. Forschungsforum der österreichischen Fachhochschulen), Wien (Favoriten), Österreich, 2011, pp. 372-373 |
| 2011 | Which utilization and service level lead to the maximum EVA? K. Altendorfer, H. Jodlbauer - Which utilization and service level lead to the maximum EVA? - INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, Vol. 130, No. 1, 2011, pp. 16-26 |
| 2011 | Intelligent rather than cheap manufacturing. C. Weger - Nicht billiger, sondern intelligenter produzieren - Industrie Management, 2011, pp. 47-50 |
| 2011 | An analytical model for service level and tardiness in a single K. Altendorfer, H. Jodlbauer - An analytical model for service level and tardiness in a single - INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol. 79, No. 7, 2011, pp. 1827-1850 |
| 2011 | Simultaneous Optimization of Capacity and Planned Lead Time in a Two-stage Production System with Different Customer Due Dates K. Altendorfer - Simultaneous Optimization of Capacity and Planned Lead Time in a Two-stage Production System with Different Customer Due Dates - EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Vol. 213, No. 1, 2011, pp. 134-146 |
| 2011 | Virtual- and Mixed Reality as tools to create an efficient assembly process in a short time F. Obermair, V. Nassiri, C. Weger, F. Freudhofer, J. Reitzenberger, R. Wiesinger, R. Guse - Virtual- und Mixed Reality als Werkzeuge um effiziente Montageprozesse in kurzer Zeit zu gestalten in Forschungsinitiative AGTIL 2011 (Editors: C. Engelhardt-Nowitzki, R. Kohlberger, R. Traxler) - Shaker Verlag, 2011, pp. 29-40 |
| 2011 | The Courage to Expose Oneself to the Unknown - Our Most Importang Locational Advantage J. Althaler, R. Schmidt, N. Heinzle - Mut zum Unbekannten - unser wichtigster Standortvorteil - Industrie Management, Vol. 2, No. 27, 2011, pp. 42-44 |
| 2010 | Comparison of different methods for CONWIP parameter setting – a review A. Hübl, K. Altendorfer, H. Jodlbauer, J. Pilstl - Comparison of different methods for CONWIP parameter setting – a review in Forschungsbeiträge zur Logistik (Editors: F. Staberhofer, C. Engelhardt-Nowitzki) - Shaker Verlag, 2010, pp. 15 |
| 2010 | Trade-off between capacity invested and inventory needed H. Jodlbauer, K. Altendorfer - Trade-off between capacity invested and inventory needed - EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Vol. 203, No. 1, 2010, pp. 118-133 |
| 2010 | Determination of the Tribological Characteristics of Plastic Granulates in Plasticizing units for Plastics Processing C. Kneidinger, G. Zitzenbacher, A. Kögler - Ermittlung der tribologischen Eigenschaften von Kunststoffgranulaten in Plastifiziersystemen für die Kunststoffverarbeitung - Proceedings FFH 2010, Pinkafeld, Österreich, 2010, pp. 522-523 |
| 2010 | Wie optimieren Sie Ihre Disposition H. Jodlbauer, P. Weiss - Wie optimieren Sie Ihre Disposition - Productivity Management, Vol. 2010, No. 2, 2010, pp. 47-49 |
| 2010 | Customer Driven Capacity Setting A. Hübl, K. Altendorfer, H. Jodlbauer, J. Pilstl - Customer Driven Capacity Setting - Advances in Production Management Systems. New Challenges, New Approaches, Bordeaux, Frankreich, 2010, pp. 291-298 |
| 2010 | Industrial Computed Tomography J. Kastner - Industrielle Computertomografie - Industrielle Computertomografie 2010, Wels, Österreich, 2010 |
| 2010 | Simple cumulative model for Due Date Setting K. Altendorfer, H. Jodlbauer - Simple cumulative model for Due Date Setting in Leobener Logistik Cases (Editors: C. Engelhardt-Nowitzky, O. Nowitzky, H. Zifkowits) - Gabler Verlag, 2010, pp. 303-320 |
| 2009 | Influence of Thermal Material Properties on the Heating Step of Pipe Belling J. F. Pühringer, G. Zitzenbacher - Influence of Thermal Material Properties on the Heating Step of Pipe Belling - Proceedings of Europes and Africas Regional Meeting 2009, Polymer Processing Society (PPS), Larnaca, Zypern, 2009, pp. 6 |
| 2009 | Heating Simulation of the Pipe Belling Process of Thermoplastic Pipes J. F. Pühringer, G. Zitzenbacher - Simulation des Aufheizprozesses beim Muffenformen an Kunststoffrohren - Internationales Forum Mechatronik 2009, Linz, Österreich, 2009, pp. 6 |
| 2009 | Concept for Conwip implemention in SAP R/3 A. Hübl, K. Altendorfer, M. Dickbauer, H. Jodlbauer - Konzept zur Umsetzung der Produktionsplanungsmethode CONWIP in SAP - 3. Forschungsforum der Österreichischen Fachhochschulen, Villach, Österreich, 2009, pp. 179-184 |
| 2009 | Flexible Production Simulation for Applied Sciences K. Altendorfer, J. Pilstl, A. Hübl, H. Jodlbauer - Flexible Production Simulation for Applied Sciences - Proceedings of the International Workshop on Modeling & Applied Simulation 2009, Teneriffa, Spanien, 2009, pp. 218-223 |
| 2009 | Equipment performance measurement in production A. Hübl, K. Altendorfer, J. Pilstl, H. Jodlbauer - Equipment performance measurement in production - Proceedings of the IEEE 2nd International Symposium on Logistics and Industrial Informatics (Lindi 2009), Linz, Österreich, 2009, pp. 178-183 |
| 2008 | Is it Useful for Small and Medium-Sized Enterprises (SME) to Implement Continuous Improvement Processes? K. Feil, C. Weger - Ist die Einführung von kontinuierlichen Verbesserungsprozessen in Klein- und Mittelunternehmen (KMU) sinnvoll? - Proceedings FH Science Day 2008, Linz, Österreich, 2008, pp. 342-352 |
| 2008 | Wertschaffende sowie kundenorientierte Planung und Steuerung H. Jodlbauer - Wertschaffende sowie kundenorientierte Planung und Steuerung - Springer Verlag, 2008 |
| 2008 | Customer Driven Production Planning H. Jodlbauer - Customer Driven Production Planning - International Journal of Production Economics, Vol. 111, No. 2, 2008, pp. 793-801 |
| 2008 | Heating Simulation of the Pipe Belling Process J. Pühringer, G. Zitzenbacher - Heating Simulation of the Pipe Belling Process - Proceedings of Americas Regional Meeting, Polymer Processing Society (PPS), Charleston, Vereinigte Staaten von Amerika, 2008, pp. 2 |
| 2008 | Customization of CONWIP for an automotive supplier K. Altendorfer, D. Aigner - Customization of CONWIP for an automotive supplier - FH Science Day 2008, Linz, Linz, Österreich, 2008, pp. 382-390 |
| 2008 | Proceedings FH Science Day 2008 H. Jodlbauer - Proceedings FH Science Day 2008 - Shaker Verlag, 2008 |
| 2008 | Service level determining bottleneck and MTO ability K. Altendorfer, A. Weidenhiller, H. Jodlbauer - Liefertreue determinierender Engpass und MTO Fähigkeit - Tagungsband 2. Forschungsforum der österreichischen Fachhochschulen, Wels, Österreich, 2008, pp. 152-157 |
| 2008 | Mobile measurement of cutting tool wear F. Obermair - Werkzeugverschleiß mobil messen und dokumentieren - WB Werkstatt + Betrieb, 2008, pp. 34-36 |
| 2008 | Service level performance of MRP, KANBAN, CONWIP and DBR due to parameter stability and environmental robustness H. Jodlbauer, A. Huber - Service level performance of MRP, KANBAN, CONWIP and DBR due to parameter stability and environmental robustness - INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol. 46, No. 8, 2008, pp. 2179-2195 |
| 2008 | A time continuous analytic prodcution model for service-level, WIP, lead-time and utilization H. Jodlbauer - A time continuous analytic prodcution model for service-level, WIP, lead-time and utilization - International Journal of Production Research, Vol. 46, No. 7, 2008, pp. 1723-1744 |
| 2008 | Wege zur Einfachheit H. Jodlbauer - Wege zur Einfachheit - Industrie Management, Vol. 2008, No. 3, 2008, pp. 17-19 |
| 2007 | Bandit-Based Monte-Carlo Planning for the Single-Machine Total Weighted Tardiness Scheduling Problem G. K. Kronberger, R. Braune - Bandit-Based Monte-Carlo Planning for the Single-Machine Total Weighted Tardiness Scheduling Problem - LECTURE NOTES IN COMPUTER SCIENCE, Vol. 4739, No. 4739, 2007, pp. 837-844 |
| 2007 | Verschwendung erkennen - Gesamtanlageneffizienz steigern C. Weger - Verschwendung erkennen - Gesamtanlageneffizienz steigern - DRUCKGUSS-PRAXIS, Vol. 2007, No. 4, 2007, pp. 6 |
| 2007 | Fast Generation of Production Schedules on a Single Machine A. Weidenhiller, H. Jodlbauer - Fast Generation of Production Schedules on a Single Machine - Proceedings of International Conference Computer Aided Systems Theory EUROCAST 2007, Las Palmas, Spanien, 2007, pp. 861-869 |
| 2007 | Monitoring of logistical performance fuels productivity in production J. Althaler, R. Schmidt - Die Produktion planen - oder Geld verdienen? - PPS Management, Vol. 2007, No. 2, 2007, pp. 62-65 |
| 2007 | Economic value orientied design of a production system H. Jodlbauer - Wertschaffende Auslegung der Produktion - PPS Management, Vol. 12, No. 2, 2007, pp. 58-61 |
| 2007 | CONWIP – Good delivery reliability at low WIP K. Altendorfer, H. Jodlbauer - CONWIP – Hohe Liefertreue bei gleichzeitig niedrigen Beständen - PPS Management, 2007, pp. 16-19 |
| 2007 | Successful Ramp-up - Survey of the Austrian Electronic- and Machine Building Industry J. Althaler, R. Peterseil - Erfolgsfaktor Produktüberleitung - Industrie Management, Vol. 2007, No. 3, 2007, pp. 59-62 |
| 2007 | Produktionsoptimierung H. Jodlbauer - Produktionsotpimierung - Springer Verlag, 2007 |
| 2007 | Outsourcing - An austrian survey R. Gmainer, H. Jodlbauer - Produktionsverlagerung unter der Lupe - Industrie Management, 2007, pp. 52-55 |
| 2007 | Simulation-based Comparison of Integrated Scheduling with MRP and KANBAN A. Weidenhiller, G. K. Kronberger - Simulationsgestützter Vergleich des Integrierten Scheduling Modells mit MRP und KANBAN - Proceedings FH Science Day 2007, Wels, Österreich, 2007, pp. 139-143 |
| 2007 | Behaviour of MRP, Kanban, CONWIP and DBR under dynamic environmental variability K. Altendorfer, A. Huber, H. Jodlbauer - Behaviour of MRP, Kanban, CONWIP and DBR under dynamic environmental variability in Leobener Logisitk Cases Band 4 (Genauer Titel noch nicht bekannt), 2007, pp. 113-128 |
| 2007 | Entscheidung unter der Lupe R. Gmainer, H. Jodlbauer - Entscheidung unter der Lupe - Logistik Heute, 2007, pp. 48-49 |
| 2007 | Proceedings FH Science Day H. Jodlbauer - Proceedings FH Science Day - Shaker Verlag, 2007 |
| 2007 | An Approach for Capacity Checking and Due Date Adjustment K. Altendorfer, H. Jodlbauer - An Approach for Capacity Checking and Due Date Adjustment - Proceedings FH Science Day 2007, Wels, Österreich, 2007, pp. 160-167 |
| 2006 | An approach for integrated scheduling and lot-sizing H. Jodlbauer - An approach for integrated scheduling and lot-sizing - EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Vol. 172, No. 2, 2006, pp. 386-400 |
| 2006 | Komplexe Systeme spielend verstehen H. Jodlbauer, R. Gmainer - Komplexe Systeme spielend verstehen - FACTORY, Vol. 2006, No. 5, 2006, pp. 18 |
| 2006 | The concept of “customer driven production planning” for evaluation of job-shop system performance K. Altendorfer, H. Jodlbauer - The concept of “customer driven production planning” for evaluation of job-shop system performance - Proceedings FH Science Day 2006, Hagenberg, Österreich, 2006, pp. 139-149 |
| 2006 | Make Span Minimization for Parallel machines H. Jodlbauer, W. Promberger - Make Span Minimization for Parallel machines - Proceedings FH Science Day 2006, Hagenberg, Österreich, 2006, pp. 150-152 |
| 2006 | Auslagern - aber richtig H. Jodlbauer, R. Gmainer - Auslagern - aber richtig - FACTORY, Vol. 2006, No. 9, 2006, pp. 22-24 |
| 2006 | Erfolgsfaktor Liefertreue - Hohe Liefertreue sichert Wettbewerbsvorteil H. Jodlbauer, R. Gmainer - Erfolgsfaktor Liefertreue - Hohe Liefertreue sichert Wettbewerbsvorteil - PPS Management, Vol. 2006, No. 4, 2006, pp. 44-47 |
| 2006 | Proceedings FH Science Day 2006 H. Jodlbauer - Proceedings FH Science Day 2006 - Shaker Verlag, 2006 |
| 2006 | Changeover - 10 Commandements C. Weger - Rüstzeiten - Die 10 Gebote - FACTORY, Vol. 2006, No. 4, 2006 |
| 2006 | New Developments in Scheduling - Improved Model and Solver Approaches A. Weidenhiller, G. K. Kronberger - Neue Ergebnisse bei der simultanen Berechnung von Losgrößen und Reihenfolge für mehrere Produkte - Proceedings FH Science Day 2006, Hagenberg, Österreich, 2006, pp. 153-159 |
| 2006 | Potentialidentifikation durch Anwendung eines PPS-Planspiels H. Jodlbauer, R. Gmainer - Potentialidentifikation durch Anwendung eines PPS-Planspiels - PPS Management, Vol. 2006, No. 3, 2006, pp. 41-43 |
| 2006 | Little`s Law in a continuous setting H. Jodlbauer, W. Stöcher - Little`s Law in a continuous setting - INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, Vol. 103, No. 1, 2006, pp. 10-16 |
| 2006 | Auslastung: Erfolgskennzahl für Produktionsleiter? H. Jodlbauer, C. Weger, S. Stockinger - Auslastung: Erfolgskennzahl für Produktionsleiter? - Industrie Management, Vol. 2006, No. 4, 2006, pp. 57-60 |
| 2006 | Mehr Liefertreue, kürzere Lieferzeit H. Jodlbauer - Mehr Liefertreue, kürzere Lieferzeit - Logistik Heute, Vol. 2006, No. 10, 2006, pp. 60-61 |
| 2006 | Automated Simulation Model Generation for Scheduler-Benchmarking in Manufacturing G. K. Kronberger, A. Weidenhiller, B. Kerschbaumer, H. Jodlbauer - Automated Simulation Model Generation for Scheduler-Benchmarking in Manufacturing - Proceedings of the International Mediterranean Modelling Multiconference (I3M 2006), Barcelona, Spanien, 2006, pp. 45-50 |
| 2006 | Total Effective Equipment Productivity M. Schöffer, C. Weger - Total Effective Equipment Productivity - Proceedings FH Science Day 2006, Hagenberg, Österreich, 2006, pp. 166-171 |
| 2006 | Minimale Belegungszeit paralleler Anlager H. Jodlbauer, W. Promberger - Minimale Belegungszeit paralleler Anlager - PPS Management, Vol. 2006, No. 1, 2006, pp. 48-50 |
| 2006 | Automated Generation of Simulation Models from ERP Data - An Example G. K. Kronberger, A. Weidenhiller - Automated Generation of Simulation Models from ERP Data - An Example - Proceedings FH Science Day 2006, Hagenberg, Österreich, 2006, pp. 160-165 |
| 2005 | Definition and properties of the input-weighted average lead-time H. Jodlbauer - Definition and properties of the input-weighted average lead-time - EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Vol. 164, No. 2, 2005, pp. 352-357 |
| 2005 | Proceedings FH Science Day 2005 H. Jodlbauer - Proceedings FH Science Day 2005 - Shaker Verlag, 2005 |
| 2005 | Das Dilemma der PPS-Systeme H. Jodlbauer, R. Gmainer - Das Dilemma der PPS-Systeme - FACTORY, Vol. 2005, No. 9, 2005, pp. 130-131 |
| 2005 | Testing a new approach for the multi-item dynamic scheduling problem S. Reitner, A. Weidenhiller - Testing a new approach for the multi-item dynamic scheduling problem - Proceedings of FH Science Day 2005, Steyr, Österreich, 2005, pp. 131-137 |
| 2005 | Range, work in progress and utilization H. Jodlbauer - Range, work in progress and utilization - INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol. 43, No. 22, 2005, pp. 4771-4786 |
| 2005 | Erfolgsfaktor Flexibilität - Was zeichnet liefertreue Unternehmen aus? H. Jodlbauer, W. Schaumberger - Erfolgsfaktor Flexibilität - Was zeichnet liefertreue Unternehmen aus? - PPS Management, Vol. 2005, No. 3, 2005, pp. 34-37 |
| 2005 | Implizite Determinierung von Plan-Belegungszeiten H. Jodlbauer, K. Palmetshofer, S. Reitner - Implizite Determinierung von Plan-Belegungszeiten - WIRTSCHAFTSINFORMATIK, Vol. 47, No. 2, 2005, pp. 101-108 |
| 2005 | Wunderwelt auf Rädern H. Jodlbauer, G. Gugenberger, C. Mager - Wunderwelt auf Rädern - FACTORY, Vol. 2005, No. 4, 2005, pp. 14-16 |
| 2004 | Maximizing operating income by determining the optional product-mix at single constrained companies in shortrun focus H. Jodlbauer, W. Schaumberger - Maximizing operating income by determining the optional product-mix at single constrained companies in shortrun focus - Annals of DAAAM for 2004, Vol. 15, No. 9, 2004, pp. 409-410 |
| 2004 | Flexible Losgrößen zur gleichzeitigen Reduktion von Rüst- und Lagerkosten H. Jodlbauer, K. Palmetshofer, S. Reitner - Flexible Losgrößen zur gleichzeitigen Reduktion von Rüst- und Lagerkosten - PPS Management, Vol. 2004, No. 4, 2004, pp. 44-48 |
| 2004 | Discussion of the standard processing time H. Jodlbauer - Discussion of the standard processing time - International Journal of Production Research, Vol. 42, No. 7, 2004, pp. 1471-1479 |
| 2002 | A New Optimal Demand Forecast Model J. Althaler, H. Jodlbauer - A New Optimal Demand Forecast Model - Operations Research Proceedings 2002, Klagenfurt, Österreich, 2002, pp. 71-76 |

