| 2011 |
Capacity and Inventory Planning for Make-to-Order Production Systems - The Impact of a Customer Required Lead Time Distribution K. Altendorfer - Capacity and Inventory Planning for Make-to-Order Production Systems - The Impact of a Customer Required Lead Time Distribution - Phd Thesis, Universität Wien, Österreich, 2011, pp. 1-168 |
| 2011 |
Two Measures of Production System Flexibility and their Application to Identify Optimal Capacity Investment K. Altendorfer, C. Engelhardt-Nowitzki, H. Jodlbauer - Two Measures of Production System Flexibility and their Application to Identify Optimal Capacity Investment - Proceedings - 1st International Conference on Value Chain Management Steyr 2011, Steyr, Österreich, 2011, pp. 441-461 |
| 2011 |
Cost and Profit Distribution in Value Chains K. Altendorfer, S. Reitner, H. Jodlbauer, G. Atzlinger - Cost and Profit Distribution in Value Chains - Proceedings - 1st International Conference on Value Chain Management Steyr 2011, Steyr, Österreich, 2011, pp. 339-360 |
| 2011 |
Einfluss von Vorgriffshorizont und WIP Grenze auf logistische Kennlinien in einem Conwip System A. Hübl, K. Altendorfer, H. Jodlbauer - Einfluss von Vorgriffshorizont und WIP Grenze auf logistische Kennlinien in einem Conwip System - Tagungsband FFH 2011 (5. Forschungsforum der österreichischen Fachhochschulen), Wien (Favoriten), Österreich, 2011, pp. 372-373 |
| 2011 |
Flexible model for analyzing production systems with discrete event simulation A. Hübl, K. Altendorfer, H. Jodlbauer, M. Gansterer, R. Hartl - Flexible model for analyzing production systems with discrete event simulation - Proceedings of 2011 Winter Simulation Conference, Phoenix, Vereinigte Staaten von Amerika, 2011, pp. 1559-1570 |
| 2011 |
Simultaneous Optimization of Capacity and Planned Lead Time in a Two-stage Production System with Different Customer Due Dates K. Altendorfer, S. Minner - Simultaneous Optimization of Capacity and Planned Lead Time in a Two-stage Production System with Different Customer Due Dates - EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Vol. 213, No. 1, 2011, pp. 134-146 |
| 2011 |
Which utilization and service level lead to the maximum EVA? K. Altendorfer, H. Jodlbauer - Which utilization and service level lead to the maximum EVA? - INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, Vol. 130, No. 1, 2011, pp. 16-26 |
| 2011 |
An analytical model for service level and tardiness in a single machine MTO production system K. Altendorfer, H. Jodlbauer - An analytical model for service level and tardiness in a single machine MTO production system - INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol. 79, No. 7, 2011, pp. 1827-1850 |
| 2010 |
Trade-off between capacity invested and inventory needed H. Jodlbauer, K. Altendorfer - Trade-off between capacity invested and inventory needed - EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Vol. 203, No. 1, 2010, pp. 118-133 |
| 2010 |
Simple cumulative model for Due Date Setting K. Altendorfer, H. Jodlbauer - Simple cumulative model for Due Date Setting in Leobener Logistik Cases (Editors: C. Engelhardt-Nowitzky, O. Nowitzky, H. Zifkowits) - Gabler Verlag, 2010, pp. 303-320 |
| 2010 |
Comparison of different methods for CONWIP parameter setting – a review A. Hübl, K. Altendorfer, H. Jodlbauer, J. Pilstl - Comparison of different methods for CONWIP parameter setting – a review in Forschungsbeiträge zur Logistik (Editors: F. Staberhofer, C. Engelhardt-Nowitzki) - Shaker Verlag, 2010, pp. 15 |
| 2010 |
Customer Driven Capacity Setting A. Hübl, K. Altendorfer, H. Jodlbauer, J. Pilstl - Customer Driven Capacity Setting - Advances in Production Management Systems. New Challenges, New Approaches, Bordeaux, Frankreich, 2010, pp. 291-298 |
| 2009 |
Konzept zur Umsetzung der Produktionsplanungsmethode CONWIP in SAP A. Hübl, K. Altendorfer, M. Dickbauer, H. Jodlbauer - Konzept zur Umsetzung der Produktionsplanungsmethode CONWIP in SAP - 3. Forschungsforum der Österreichischen Fachhochschulen, Villach, Österreich, 2009, pp. 179-184 |
| 2009 |
Equipment performance measurement in production A. Hübl, K. Altendorfer, J. Pilstl, H. Jodlbauer - Equipment performance measurement in production - Proceedings of the IEEE 2nd International Symposium on Logistics and Industrial Informatics (Lindi 2009), Linz, Österreich, 2009, pp. 178-183 |
| 2009 |
Flexible Production Simulation for Applied Sciences K. Altendorfer, J. Pilstl, A. Hübl, H. Jodlbauer - Flexible Production Simulation for Applied Sciences - Proceedings of the International Workshop on Modeling & Applied Simulation 2009, Teneriffa, Spanien, 2009, pp. 218-223 |
| 2009 |
Kundenorientierte Kapazitätsplanung in Produktionsunternehmen K. Altendorfer - Kundenorientierte Kapazitätsplanung in Produktionsunternehmen - Netzwerk Logistik, 2009, pp. 28-29 |
| 2008 |
Liefertreue determinierender Engpass und MTO Fähigkeit K. Altendorfer, A. Weidenhiller, H. Jodlbauer - Liefertreue determinierender Engpass und MTO Fähigkeit - Tagungsband 2. Forschungsforum der österreichischen Fachhochschulen, Wels, Österreich, 2008, pp. 152-157 |
| 2008 |
Customization of CONWIP for an automotive supplier K. Altendorfer, D. Aigner - Customization of CONWIP for an automotive supplier - FH Science Day 2008, Linz, Linz, Österreich, 2008, pp. 382-390 |
| 2007 |
CONWIP – Hohe Liefertreue bei gleichzeitig niedrigen Beständen K. Altendorfer, H. Jodlbauer - CONWIP – Hohe Liefertreue bei gleichzeitig niedrigen Beständen - PPS Management, 2007, pp. 16-19 |
| 2007 |
An Approach for Capacity Checking and Due Date Adjustment K. Altendorfer, H. Jodlbauer - An Approach for Capacity Checking and Due Date Adjustment - Proceedings FH Science Day 2007, Wels, Österreich, 2007, pp. 160-167 |
| 2007 |
A new dispatching rule for optimising machine utilisation at a semiconductor test field K. Altendorfer, B. Kabelka, W. Stöcher - A new dispatching rule for optimising machine utilisation at a semiconductor test field - ASMC Proceedings 2007, Stresa, Italien, 2007, pp. 188-193 |
| 2007 |
Behaviour of MRP, Kanban, CONWIP and DBR under dynamic environmental variability K. Altendorfer, A. Huber, H. Jodlbauer - Behaviour of MRP, Kanban, CONWIP and DBR under dynamic environmental variability in Leobener Logisitk Cases Band 4 (Genauer Titel noch nicht bekannt), 2007, pp. 113-128 |
| 2006 |
The concept of “customer driven production planning” for evaluation of job-shop system performance K. Altendorfer, H. Jodlbauer - The concept of “customer driven production planning” for evaluation of job-shop system performance - Proceedings FH Science Day 2006, Hagenberg, Österreich, 2006, pp. 139-149 |